Manufacturing simulation & automationGroup project · 2026
AGV production-line simulation
Redesigned material flow and evaluated a two-AGV production line in FlexSim 2026 against a manual-transport model.

My contribution
Process improvement designer and simulation contributor: production layout, AGV routing, model refinement, and comparison of operational results.
The project
THE CHALLENGE Our group studied material movement between a warehouse, kitting area, PCB assembly, packaging, and a finish waiting area. The academic case study used DENSO Malaysia as its manufacturing context.
MY CONTRIBUTION The group report assigns me process improvement design and simulation roles. I worked on the proposed layout and transport flow, modelling and refining AGV routes and comparing the existing and proposed systems in FlexSim 2026.
THE PROPOSAL Two unit-load AGVs serve different parts of the line. The team compared the manual-transport and AGV models over an eight-hour simulation under the same stated production conditions.
SIMULATED RESULTS The report records 201 completed units in the manual model and 346 in the AGV model, a 72.1% increase. Average staytime at the start waiting area fell from 8,339.33 to 3,957.45 seconds, a 52.5% reduction.
These are results reported for an academic simulation and depend on its assumptions. They do not represent a deployed factory improvement or an employment relationship with DENSO. The team also proposed cost estimates and an implementation plan; neither was a completed installation.
Outcome
+72.1% throughput in simulation